Decisions to make

What must be clear

  • 01Core production methods
  • 02Peak batch size
  • 03New, used or leased equipment
  • 04Maintenance and redundancy

Work the problem

Practical next actions

  • Map each menu item to equipment
  • Calculate simultaneous peak demand
  • Separate essential from optional equipment
  • Document installation, utility and service requirements

Avoid

Common failure patterns

  • Buying before the menu stabilizes
  • Ignoring smallwares and storage
  • Used equipment without service history
  • No plan for a single point of failure