02 · Open

Coordinate the work between the lease and first service.

Build a realistic opening path across location, design, equipment, vendors, hiring, training and local approvals.

Work before commitment

Turn decisions into a controlled opening path.

Opening work has dependencies. A clear plan separates decisions, tasks, approvals, testing and true readiness.

01

Create an opening timeline with real dependencies

An opening plan is not a long checklist. It is a dependency map showing which decisions block design, hiring, training, vendor setup and approvals.

Read →
02

Evaluate a restaurant location as an operating system

A location must support demand, access, production, utilities, deliveries, waste, staff movement and the full cost of occupancy.

Read →
03

Build the equipment plan from the menu and throughput

Equipment should follow the production system. Begin with products, processes, batch sizes, peak volume, holding limits and cleaning requirements.

Read →
04

Choose vendors by operational fit, not feature count

The right vendor reduces friction in the actual restaurant. Evaluate implementation, support, data access, failure modes and total switching cost.

Read →
05

Hire for the operating model you can actually support

Pre-opening hiring should translate the service model into clear roles, decision rights, schedules, training outcomes and management capacity.

Read →
06

Design a soft opening as a controlled test

A soft opening should test specific systems at intentionally limited volume. It is not a discounted grand opening.

Read →
07

Treat opening day as the beginning of stabilization

The goal is controlled, recoverable service with clear leadership and a disciplined learning loop, not a flawless performance.

Read →

Working plan

Connect these decisions to your restaurant.

Open my plan